NativeBIM / Server roadmap and limits
NativeBIM by NativeCAD
IFC server roadmap and limits
What is planned and when, and the gap list: what NativeBIM cannot do yet. A row leaves the gap list only when its test passes.
Roadmap
Planned. The months are targets, reviewed on ; this list changes when the plan does.
- Oct 2026
Started
IFC reader and writer, geometry, test-fit engines, document writers, licensing and updates: built and tested.
- Oct 2026
Beta
Signed beta builds: a Claude Desktop bundle, a Cowork plugin and an npm package. Version 0.2.0 opens, asks, checks, repairs, edits, draws and exports IFC models from the assistant.
- Nov 2026
Generate and hand over
Test fit and generate from the assistant, so one session can open, ask, change, generate, document and hand over.
- Dec 2026
Public release
The MCP plugin, the product pages and pricing.
- 2027
Depth
Detailed authoring (curtain walls, stairs, MEP and structure), sections and elevations, the full Revit path through IFC export, owner handover with IDS, BCF and COBie, and large models.
Limits: the gap list
What NativeBIM does not do yet, stated before you find it. Reviewed .
- The tools. Version 0.2.0 serves the tools in the tool reference. The test-fit, generate, build-plan and view tools are designed and answer
NB_TOOL_UNAVAILABLEuntil they ship.bim_editchanges and moves elements and adds or removes doors, windows and openings, but does not build walls, slabs, columns, spaces, stories or grids yet. - Authoring depth. The builder writes walls, slabs, roofs, columns, doors, windows, grids and spaces. Site paving and parking are in development. Stairs, curtain walls, ceilings, families and type catalogs, MEP and structural framing are not covered.
- Documentation depth.
bim_drawingdraws a floor plan on an ARCH D sheet as PDF or SVG; schedules export as XLSX or CSV. Area plans and schedules on sheets, other sheet sizes and DXF sheets are in development. Elevations and sections, revisions and the Portland correction cycle, and MEP and structural sheets are planned. - Exact geometry. Plan cuts, areas and quantities use NativeBIM's own mesh and 2D polygon geometry. Exact B-rep operations and STEP export through the NativeCAD kernel are planned.
- Native Revit. Metadata only. There is no direct Revit geometry import; full models come through Revit's IFC export.
- Pre-release schemas. IFC4X3 release candidates and earlier 4.x builds open as IFC4X3_ADD2 with a warning. A check that flags values in entities that changed between versions is planned.
- Permits. None of the six Oregon permit offices whose pages we read on 2026-10-22 lists IFC models as an accepted submittal; Portland's file standards list PDF and 2D DWF. NativeBIM's sheets are drafts for the licensed professional of record and are marked NOT FOR CONSTRUCTION by default.
- Codes. Zoning and code tables cover Portland, Oregon, for named editions. Some code-table values were read from secondary transcriptions and are flagged unverified in the output. Screening results are drafts.
- Scale and collaboration. One user on one machine. Large-model streaming, concurrency, merge and a remote server are planned.
- Assistants. Results depend on the assistant you connect. The BIM-Edit benchmark in the numbers on the front door shows language models fail often on IFC edits; the engine rejects invalid edits but cannot supply intent.
- Standards. IFC5 is not supported. buildingSMART International has not reviewed or endorsed NativeBIM.
Notices
NativeBIM is licensed software. It does not provide design, engineering or other professional services. Outputs are drafts for review by the licensed professional of record.
Sheets are marked NOT FOR CONSTRUCTION by default.
Areas are computed by NativeBIM, not a certified BOMA measurement.
NativeBIM is not affiliated with, endorsed by or sponsored by the companies and organizations named here. Product names and marks belong to their owners.
NativeBIM is provided as is, without warranty of any kind. To the extent the law allows, FeatureBoard Labs Incorporated is not liable for indirect, incidental or consequential damages, lost profits or lost data, and its total liability is limited to the license fees paid in the 12 months before the claim. Read the license.