NativeBIM by NativeCAD

NativeBIM / Demos / Footbridge on an IFC4.3 alignment

NativeBIM by NativeCAD

IFC showcase: Footbridge on an IFC4.3 alignment

A steel truss footbridge laid out along an IFC4.3 alignment, with a plan and profile sheet and a frame screening under dead and pedestrian load. It is not a real bridge.

Preliminary, not engineering. Preliminary structural screening, not engineering and not for construction. Numbers come from a simplified model and simplified loads; a licensed professional engineer designs the structure. Outputs are drafts for review by the licensed professional of record.

This model is illustrative. It is built from a script with the dimensions listed under Sources, and it does not represent an existing or as-built building.

3D model

The viewer opens footbridge-alignment.glb, the glTF that NativeBIM writes from the IFC file. The IFC file is footbridge-alignment.ifc.

What is in the model

ItemCount or value
Slabs2
Storeys1

Requirements

Not checked as a building: a footbridge, not a building.

Drawing set

Draft drawing set generated from the model: footbridge-alignment-drawings.pdf (PDF, 2 sheets).

Elevations are not generated yet, so this drawing set has plans and schedules only. Sections are not generated yet, so this drawing set has plans and schedules only.

Alignment and frame screening

This showcase shows a preliminary structural screening of the model: member forces, deflections and support reactions from a linear elastic frame model under simplified loads based on ASCE 7-22. It is not engineering, not a structural design and not a check against any building code, and it is not for construction. A licensed professional engineer designs and takes responsibility for any real structure. Outputs are drafts for review by the licensed professional of record. NativeBIM is not affiliated with, endorsed by or sponsored by the companies and organizations named here. Product names and marks belong to their owners. The bridge is 30 m long in 10 panels of 3 m, laid out by station along an IfcAlignment 120 m long. The IFC4.3 geometry code evaluated the alignment written in the file and it agrees with the positions the layout used to within 1 mm at every metre of station (0 diagnostics). The frame solver then ran a linear analysis of the 114 members under dead and pedestrian live load. Under live load the midspan deflection is 16.9 mm, against a span / 360 limit of 83.3 mm; the vertical frequency estimated from the dead-load deflection is 4.99 Hz against 3 Hz in the guide specification. A guard and a round handrail run along both truss lines; the largest opening measured in the file's geometry admits a sphere of 94 mm against the 4 in (101.6 mm) limit, and the lowest top is 1070 mm over the deck against 42 in (1066.8 mm).

Plan and profile of the approach alignment: a line, a left arc and a line in plan with station ticks every 10 m and the two truss lines in red; below, the profile with a crest and the bridge span shaded
Plan and profile sheet. The alignment is the one written to the IFC as an IfcAlignment; the truss lines are the bottom chords between stations 24 and 54.
Truss nodes: the alignment at each panel point (metres, site coordinates) and the grade there in percent
Station (m)x (m)y (m)Deck elevation (m)Grade (percent)
2423.5224.768100.7122.6
2726.4625.364100.7852.3
3029.4025.96100.852
3332.3426.556100.9051.7
3635.2827.152100.9521.4
3938.2157.785100.9891.1
4241.1318.491101.0180.8
4544.0289.269101.0380.5
4846.90510.12101.0480.2
5149.75911.042101.05-0.1
5452.5912.035101.042-0.4
Approach walks, accessible route check (2010 ADA Standards 403.3: running slope 1:20 or less, cross slope 1:48 or less; steeper than 1:20 is a ramp under 405)
ApproachStations (m)Largest running slope (percent)Cross slope (percent)Ramp needed
Start approach0 to 23.930no
End approach54.1 to 12030no
Screening checks, with the assumptions named in the sources
CheckValueReference
Midspan deflection under pedestrian live load (mm)16.9span / 360 = 83.3 mm
Midspan deflection under dead load (mm)12.8used for the frequency estimate
Vertical frequency estimate (Hz)4.993 Hz or more in the guide specification
Largest opening through a guard, measured from the geometry in the file (mm)94a sphere of 4 in (101.6 mm) must not pass; truss members given no credit
Lowest top of a guard over the deck, whole length (m)1.07at least 42 in (1.067 m); handrail top 0.914 m (36 in)
Guard and handrail weight, both sides (kN)14.23158.1 Pa over the deck, inside the 1500 Pa superimposed dead load already applied
Sum of vertical reactions, service load (kN)681.9equals the applied load and self-weight
Largest member axial forces under 1.2 D + 1.6 L, in kN (compression given as a positive number)
Member groupLargest tension: memberkNLargest compression: memberkN
Bottom chordBC-R6389.6BC-R10446.8
Top chordTC-L10-1.9TC-R6932
DiagonalD-R9338.9D-R10445
PostV-R767.3V-L04
Support reactions
NodeFx (kN)Fy (kN)Fz (kN)
N1154.4657.60137.15
N21-133.1922.75112.87
N23508.84103.72211.59
N43-530.10-184.07220.26
Largest deflections from the chord, by span ratio
MemberMax (mm)Span / max
V-R63.95607
V-R73.88619
V-R53.58670
V-R83.45696
V-L63.07783

The guards are not members of the frame model and add no stiffness; their weight is inside the superimposed dead load. They stand on the deck, which is not modelled as a surface, so the posts have no base fixing drawn and the guard has not been checked for the horizontal load a railing must carry.

Bearings are idealised as pins at all four support nodes with no thermal movement; the trusses are laid out on polygonal chords between the alignment points, so the curve in plan is followed to within the chord sag, not by curved members.

The viewer draws the bridge members; it has no drawing for the alignment curve, which is on the plan and profile sheet. The IFC spatial structure is an IfcBuilding with one storey because the builder does not write IfcBridge yet; the alignment sits in the IfcSite. Dimensions and loads are chosen for the sample. The largest displacement of any point is 46.35 mm, in member M58. Loads and sections are chosen for the sample.

Preliminary structural screening, not engineering and not for construction. Numbers come from a simplified model and simplified loads; a licensed professional engineer designs the structure. Outputs are drafts for review by the licensed professional of record.

Sources

Where each dimension comes from. Anything marked as chosen for the sample is an assumption, not a measurement.

Built 2026-11-01 with node tools/showcase/build.js footbridge-alignment. Re-running the command gives the same bytes.

Notices

NativeBIM is licensed software. It does not provide design, engineering or other professional services. Outputs are drafts for review by the licensed professional of record.

Sheets are marked NOT FOR CONSTRUCTION by default.

Areas are computed by NativeBIM, not a certified BOMA measurement.

IFC and Industry Foundation Classes are marks of buildingSMART International.

NativeBIM is not affiliated with, endorsed by or sponsored by the companies and organizations named here. Product names and marks belong to their owners.

NativeBIM is provided as is, without warranty of any kind. To the extent the law allows, FeatureBoard Labs Incorporated is not liable for indirect, incidental or consequential damages, lost profits or lost data, and its total liability is limited to the license fees paid in the 12 months before the claim. Read the license.