IFC showcase: Sprinklers in the ceiling plenum

Light-hazard sprinkler heads and branch lines on the office floor of the plenum showcase, with a hydraulic report of the most remote area and 0 clashes.

Preliminary, not engineering. Preliminary sprinkler layout and hydraulic screening, not engineering and not for construction. Heads, pipe sizes and pressures come from simplified rules and configurable default values taken from public summaries of NFPA 13, not from the standard itself; a qualified fire protection designer lays out and calculates the system under the edition the authority having jurisdiction adopts. Outputs are drafts for review by the licensed professional of record.

This model is illustrative. It is built from a script with the dimensions listed under Sources, and it does not represent an existing or as-built building.

3D model

The viewer opens sprinkler-plenum.glb, the glTF that NativeBIM writes from the IFC file. The IFC file is sprinkler-plenum.ifc.

What is in the model

ItemCount or value
Walls8
Doors5
Slabs1
Spaces5
Storeys2

Requirements

The model does not yet meet every requirement of an interior. Each is measured on the model’s geometry by casting rays at it from sample points 0.355 m apart.

RequirementWhat it asksResult
Every enclosed area has a floorRooms are walked on: an area walls close in at a storey level and nothing to stand on is not a room.Not yet: 4 of 724 samples fail
The interior is closed inWalls, doors and windows close every interior floor on all sides; a gap in the walls is a hole in the building.Not yet: 3128 of 6069 samples fail

Drawing set

Draft drawing set generated from the model: sprinkler-plenum-drawings.pdf (PDF, 4 sheets).

Elevations are not generated yet, so this drawing set has plans and schedules only. Sections are not generated yet, so this drawing set has plans and schedules only.

Sprinkler layout, hydraulics and clashes

Preliminary, not engineering and not for construction (ADR-012). Preliminary sprinkler layout and hydraulic screening, not engineering and not for construction. Heads, pipe sizes and pressures come from simplified rules and configurable default values taken from public summaries of NFPA 13, not from the standard itself; a qualified fire protection designer lays out and calculates the system under the edition the authority having jurisdiction adopts. Outputs are drafts for review by the licensed professional of record.

Water supply (an assumption for this sample)
ItemValueNote
Static pressure at the riser5.5 barAssumption chosen for the sample
Residual pressure4.2 bar at 1500 liters per minuteAssumption chosen for the sample
Available pressure at the demand flowstatic - (static - residual) x (Q / residual flow) to the power 1.85Hazen-Williams form of a supply curve
Hose stream allowance added to the demand378.5 liters per minute (100 gpm)NFPA 13 section 19.3.3.1.2, verified: false
Hydraulic result per room: each room is its own zone with its own riser connection. Pressures in bar, flows in liters per minute
RoomHeadsMost remote areaSprinkler flowDemand with hose streamNeeded at riser (bar)Supply at that flow (bar)Margin (bar)Result
101 Open office west66 heads, 99.8 m2605.0983.6 (259.8 gpm)3.234.901.68Supply meets demand
102 Meeting room 144 heads, 52.6 m2280.1658.6 (174.0 gpm)1.765.223.46Supply meets demand
103 Meeting room 244 heads, 48.0 m2265.8644.3 (170.2 gpm)1.525.233.70Supply meets demand
104 Open office east66 heads, 99.8 m2560.1938.6 (248.0 gpm)3.134.951.83Supply meets demand
105 Break room66 heads, 99.8 m2586.9965.4 (255.0 gpm)3.494.921.43Supply meets demand
Most remote area of the governing room, 105 Break room: flows and pressures at the heads
HeadPosition x, y (m)Protection area (m2)Flow (l/min)Pressure (bar)Required (bar)Note
114.00, 10.0017.5140.83.100.80
218.00, 10.0016.0122.62.350.66
322.00, 10.0016.090.21.270.66
417.90, 14.0016.481.41.030.70
522.00, 14.0016.480.71.020.70
614.00, 14.3817.571.40.800.80Governing head
Pipes of the governing room by bore (sizes come from the calculation; velocity and friction loss are the largest of each size)
SizePipesLength (m)Velocity (m/s)Friction loss (bar)
DN25817.25.801.190
DN4024.35.920.680
DN5012.74.980.345
Obstruction rules on the built floor (suspended ceiling at 2.7 m, heads hanging 0.05 m below it)
RoomBeams, ducts and tray above the deflectors (they obstruct pipes only)Diffusers and light panels over the room (obstruct the heads)Heads movedBaysLayout checks
101 Open office west271821Pass
102 Meeting room 113721Pass
103 Meeting room 214701Pass
104 Open office east331721Pass
105 Break room171421Pass
Obstruction rules in the what-if with no suspended ceiling (heads hung from the slab at 3.70 m, so beams and ducts hang below the deflectors). Layout only, no pipes
RoomBeams across the room (each shortens or splits the bays)Ducts under the three times ruleBaysHeadsHeads movedLayout checks
101 Open office west39282Pass
102 Meeting room 125142Pass
103 Meeting room 222141Pass
104 Open office east310283Pass
105 Break room36281Pass
Clash and clearance counts, measured with the clash detector
LayoutHard clashesCloser than 50 mm to structure or lightsCloser than 50 mm between systemsElements tested
Plenum showcase before the sprinklers (routed ducts, pipes, tray)000215
With sprinklers, branch lines routed around the ducts000399
Same heads, straight branch lines at 3.15 m68028324
Hard clashes of the straight-line layout by pair of classes (each group is a topic in the BCF file)
PairClashes
IfcCableCarrierSegment and IfcPipeSegment1
IfcDuctFitting and IfcPipeSegment4
IfcDuctSegment and IfcPipeFitting1
IfcDuctSegment and IfcPipeSegment16
IfcPipeFitting and IfcPipeSegment10
IfcPipeSegment and IfcPipeSegment36
NFPA 13 values used (recalled from public summaries, each with its section; none is checked against the publisher's document)
ValueUsedUS valueSectionStatus
maxArea20.903 m2225 ft2NFPA 13 section 10.2.4.2.1, Table 10.2.4.2.1(a)verified: false
maxSpacing4.572 m15 ftNFPA 13 section 10.2.5.2, Table 10.2.4.2.1(a)verified: false
maxWallDistance2.286 m7.5 ft (half the spacing)NFPA 13 section 10.2.5.3verified: false
minWallDistance0.102 m4 inNFPA 13 section 10.2.5.4.1verified: false
minSpacing1.829 m6 ftNFPA 13 section 10.2.5.4.2verified: false
density0.0000679 m3/s per m20.10 gpm/ft2 (4.1 mm/min)NFPA 13 section 19.3.3.1.1, Figure 19.3.3.1.1verified: false
designArea139 m21500 ft2 (139 m2)NFPA 13 section 19.3.3.1.1, Figure 19.3.3.1.1verified: false
hoseStream0.00631 m3/s100 gpm, inside and outside hose combinedNFPA 13 section 19.3.3.1.2, Table 19.3.3.1.2verified: false
minPressure48263 Pa7 psi (0.48 bar)NFPA 13 section 28.2.4.10.1verified: false
obstructionFactor3 -3 x the obstruction's widthNFPA 13 section 10.2.7.2.1.3 (the "three times rule")verified: false
obstructionMaxClear0.610 m24 inNFPA 13 section 10.2.7.2.1.3verified: false
wideObstruction1.219 m4 ftNFPA 13 section 10.2.7.2.3verified: false
Other design defaults (not NFPA 13 values)
ValueUsedSource
kFactor80design default (not NFPA 13)
C120design default (not NFPA 13)
deflector0.05design default (not NFPA 13)
minDiameter0.025design default (not NFPA 13)
maxVelocity6design default (not NFPA 13)
elbowLD30design default (not NFPA 13)
teeRunLD20design default (not NFPA 13)
teeBranchLD60design default (not NFPA 13)
temperature10design default (not NFPA 13)
minMargin0design default (not NFPA 13)
headDiameter0.05design default (not NFPA 13)
headHeight0.06design default (not NFPA 13)
fixtureClear0.15design default (not NFPA 13)

The numbers on this page are computed by the build, not typed in. Reproduce them with node tools/showcase/build.js sprinkler-plenum; a second run writes the same bytes.

26 heads in five spaces, 99.8 m of sprinkler pipe. The clash detector tested every element with a body against every other: 0 hard clashes and 0 clearance violations at 50 mm with the heads and pipes in place. Straight branch lines at one elevation that ignore the ducts, from the same risers to the same heads, have 68 hard clashes.

Most remote area. The governing room is 105 Break room: the area of operation is 6 heads over 99.8 m2, the sprinkler flow 586.9 liters per minute and the demand with the hose stream 965.4 liters per minute (255.0 gpm). The calculation needs 3.49 bar at the riser; the assumed supply gives 4.92 bar at that flow, a margin of 1.43 bar.

Each room is smaller than the 139.4 m2 design area, so the area of operation is the whole room. A real calculation would extend the area into the next room and the demand would be higher; the engine calculates one room at a time and treats each as its own zone. The rooms are not calculated together.

Obstruction rules. On the built floor the beams, the supply ducts, the cold and hot water pipes and the cable tray all hang above the deflectors, so they obstruct the branch lines and not the spray; the router passes them with 50 mm clearance. The diffusers hang below the ceiling and the light panels sit in it: the layout moved 8 heads clear of them, and 0 heads sit inside a light panel. In the what-if with the ceiling left out, the beams that run across a room cut it into bays (3 extra bays over the five rooms) and the ducts push heads out to the three times rule's distance (9 heads move, with 32 heads in all). The what-if is a layout only and is not clash-checked.

The op reads beams, members, ducts and cable carriers as obstructions to the heads, and not lights or air terminals. This showcase hands the diffusers and light panels to the layout while the op runs (scenario.js, withCeilingObstructions): a head keeps 0.1 m clear of a light panel and 0.6 m clear of a diffuser, and a tie between two ways out of a panel is broken toward the nearest wall. These two rules are choices made for this sample, not NFPA 13 rules.

NFPA 13 values are recalled from public summaries and cited by section. None is checked against the publisher's document (verified: false). The authority having jurisdiction adopts the edition that applies, and a qualified fire protection designer lays out and calculates a real system. The water supply is an assumption. The engine is a preview.

Colors in the 3D model: the sprinkler heads and pipes are yellow (an IFC surface style), apart from the supply air, cold water, hot water and cable tray colors of the plenum showcase.

Out of scope: gridded and looped systems, dry and preaction systems, other hazard classes, the standard's rectangle of operation along the branch lines, pumps and tanks, hangers and seismic bracing, and head-to-ceiling-tile detailing.

Sources

Where each dimension comes from. Anything marked as chosen for the sample is an assumption, not a measurement.

Built 2026-10-28 with node tools/showcase/build.js sprinkler-plenum. Re-running the command gives the same bytes.

Notices

NativeBIM is licensed software. It does not provide design, engineering or other professional services. Outputs are drafts for review by the licensed professional of record.

Sheets are marked NOT FOR CONSTRUCTION by default.

Areas are computed by NativeBIM, not a certified BOMA measurement.

IFC and Industry Foundation Classes are marks of buildingSMART International.

NativeBIM is not affiliated with, endorsed by or sponsored by the companies and organizations named here. Product names and marks belong to their owners.

NativeBIM is provided as is, without warranty of any kind. To the extent the law allows, FeatureBoard Labs Incorporated is not liable for indirect, incidental or consequential damages, lost profits or lost data, and its total liability is limited to the license fees paid in the 12 months before the claim. Read the license.